文章摘要
周滔.考虑围岩应力释放的饱和 Q2 黄土大断面隧道预留变形量研究[J].安徽建筑大学学报,2023,31(4):16-21
考虑围岩应力释放的饱和 Q2 黄土大断面隧道预留变形量研究
Study on the Reserved Deformation of Large Cross-section Tunnel Saturated Q2 Loess Considering the Release of Surrounding Rock Stress
  
DOI:
中文关键词: 隧道工程  富水黄土  应力释放  变形特性
英文关键词: tunnel works  saturated loess  stress release  deformation characteristics
基金项目:安徽省高校自然科学研究重点项目(KJ2019A1073)
作者单位
周滔 安徽交通职业技术学院 土木工程系安徽 合肥 230051 
摘要点击次数: 2948
全文下载次数: 0
中文摘要:
      由于饱和黄土具有含水率高、强度低、稳定性差的特点,饱和黄土隧道施工过程中常遇到初期支护沉降变形过大、预留变形量难以确定等问题。考虑到饱和 Q2 黄土承载力小,无法计算位移释放率和体积释放率,应力释放率成为研究大断面饱和黄土隧道预留变形量的有效手段。鉴于此,本文提出了饱和黄土隧道围岩应力释放率计算思路,研究了围岩变形特性及预留变形量。结果表明,饱和软黄土隧道施工过程中,围岩最终变形量受施工时间影响较大,大多数断面在监测时间范围内仍有较大变形速率,围岩应力释放不充分;现场围岩应力释放率在 25% ~ 30% 之间,当应力释放率超过 30%,拱顶沉降量迅速增大,围岩易产生失稳;建议饱和 Q2 黄土隧道施工预留变形量为 35 cm,变形控制值在 25 cm。
英文摘要:
      Due to the characteristics of high moisture content,low strength,and poor stability of saturated loess,problems suchas excessive initial support settlement deformation and difficulty in determining reserved deformation are often encountered duringthe construction of saturated loess tunnels. Considering the small bearing capacity of saturated Q2 loess,it is hard to calculate thedisplacement release rate and volume release rate,and the stress release rate has become an effective means to study the reserveddeformation of large cross-section saturated loess tunnels. This article proposes a calculation method for the stress release rate ofsaturated loess tunnel surrounding rock,and conducts a detailed study on the deformation characteristics and reserved deformationamount of the surrounding rock. The results show that the final deformation of the surrounding rock during the construction process ofsaturated soft loess tunnels is greatly affected by the construction time,and most sections still have a large deformation rate within themonitoring time range,resulting in insufficient stress release of the surrounding rock. The stress release rate of the on-site surroundingrock is between 25% and 30%. When the stress release rate exceeds 30%,the settlement of the arch crown rapidly increases,and thesurrounding rock is prone to instability. It is recommended to reserve a deformation of 35 cm for the construction of saturated Q2 loesstunnel,with a deformation control value of 25 cm.
查看全文   查看/发表评论  下载PDF阅读器
关闭

分享按钮