纪志锋,杨树萍.模糊影响图在隧道工程风险评价中的应用[J].安徽建筑大学学报,2016,24(3):97-99 |
模糊影响图在隧道工程风险评价中的应用 |
Application of Fuzzy Influence Diagram in Risk Assessment in Tunnel Engineering |
|
DOI:10.11921/j.issn.2095-8382.20160320 |
中文关键词: 隧道工程 风险管理 模糊影响图 |
英文关键词: Tunnel engineering Risk management Fuzzy influence diagram |
基金项目: |
|
摘要点击次数: 7624 |
全文下载次数: 0 |
中文摘要: |
隧道工程施工中存在大量不确定因素,科学分析和评估这些因素对项目的成功具有重要的意义。本文对风险管理方法加以讨论,在分析隧道工程项目风险评价体系的基础上,结合影响图理论和模糊数学,构造科学有效的模糊影响图风险评价模型,进行分析并给出结论,并以某隧道工程为实例进行验证,从而为企业实施风险管理提供可靠的参考依据。 |
英文摘要: |
There is a lot of uncertainty in tunnel construction, therefore scientific analysis and evaluation of these factors have important implications for the success of the project. Basing on analysis of tunnel engineering project risk evaluation system, the combination of theory and fuzzy influence diagram, this article discusses risk management methods, constructs scientifically valid risk assessment model, analyzes and draws conclusions, and validates it by a tunnel project as an example. Thereby, this article provides a reliable reference for corporate risk management. |
查看全文
查看/发表评论 下载PDF阅读器 |
关闭 |